                          | As of June, 2007, when this URL was first posted there are 11 active 2007 projects (159 - 169) in development. In addition, an equal number of projects from the 2005 - 2006 period are also still active with a number of them likely to remain so for a number of years. This work, as a body, is satisfyingly varied in many dimensions of practice [link: practice]: geography, type of building(s), kinds of setting and landscape, project size and scope, services rendered, size and kind of clients and their organizations, degree of challenge to our existing capabilities, economic consequences, ValueWeb participation, project duration, and strategic fit to the mission [link: mission] of MG Taylor. This is, of course, congruent with the goals of TSM Architecture as it is the only way to develop the knowledge, capacity and kind of practice we seek. |  
                      
                        | It is certain that over the 6 months remaining in this year and the 12 of 2008 a fair number of projects will be added making these the busiest years, in our history, by far - a practice is being born [future link]. It is not our desire to build a huge practice. It is our intent to be able to practice across the entire range of wok which we consider to be architectural in nature [link: basic architectural practice course notes - scope] from single dwellings to, ultimately, planetary and space architecture. |  
                      
                        | There are three aspects of this period which may make this work significant: First, beyond manufacturing components and furniture we will be involved with building and  field project management than we have in three decades; second, we will be recreating the entire drawing and documentation process of Design/Build/Use practices; third, our design capability, because of these technical improvements and a greater range of opportunities, will flower and begin to achieve the art of architecture we have sought for so long. This will not come easy as we are learning on Work #159 the Leopard Studio Addition. It will take a tight integration of these elements plus the  ability to exercise good judgment in regards just how far we push each project. Setting the right level-of-ambition is critical for our success. The downside slopes on both sides - too conservative or too radical - are equally dangerous. |  
                      
                        | The next 18 months will be ones of execution, execution, execution and if we can sustain it there is the possibility of being in an entirely new place by 2009-10. Work like #159, the Stan Leopard Studio Addition, in many ways, illustrates the critical step in this process. Projects such as this bring the capability I developed in the 60s to the AI work of the last 15 years to the opportunities we have in first decade of this century. These projects can smooth the path to the projects which are ahead. |  |  
                
                  | Work 1592007 
                        - Leopard Studio Addition
 |  
                
                  |  | 
                      
                        
                          | Preliminary Plan view of Studio.  click on drawingto go to web page
 |  |  
                
                  | Client: Work:
 
 Design:
 DBU Team:
 
 ValueWeb:
 Location:
 Status:
 Notes:
 | Stan Leopard Design, Manufacture, Project Manage, turn-key environment
 Matt Taylor
 Matt Taylor, Fred Stitt, Dick Lowndes, AI Shop
 This is a HabitatMakers ValueWeb Project
 Sebastopol, California
 In Design Development
 A POD Greenhouse - see Work #126 - Studio. A personal workspace for Stan Leopard off the front entry of his house.
 [link:habitatit makers vallue web]
 |  
                
                  | livability_project_prototype |  
                
                  | Work 1602007 
                        - Livability Project Prototype
 |  
                
                  | 
                    
                      
                        | 
                            2001(drawing
                                  in progress)
 |  |  |  
                
                  | Client: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | Livability Project Board Advisor - Schematic Concepts
 Matt Taylor
 n/a
 Sebastopol, California
 Planning Stage
 W.
 |  
                
                  | Work 1612007 
                        - CO-Op Villages
 |  
                
                  | 
                    
                      
                        | 
                            2001(drawing
                                  in progress)
 |  |  |  
                
                  | Subject: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | CO-Op Villages Commentary and Feedback
 Matt Taylor
 n/a
 Florida
 Work Ongoing
 W.
 |  
                
                  | moma_group_genius_exhibit |  
                
                  | Work 1622007 
                        - MOMA Exibit
 |  
                
                  | 
                    
                      
                        | 
                            2001(drawing
                                  in progress)
 |  |  |  
                
                  | Event: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | MOMA Collective Genius Exibit - 2008 Develop Concept
 Matt Taylor
 Matt Taylor, Gail Taylor
 New York City
 Work Ongoing
 W.
 |  
                
                  | Work 1632007 
                        - Xanadu Abscape
 |  
                
                  | Client: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | Stan Leopard Design, Build
 Matt Taylor
 n/a
 Sebastopol, California
 Work Ongoing
 W.
 |  
                
                  | 
                    Work 1642007 
                        - Leopard Guest House
 & Patio Trellis
 |  
                
                  | 
                    
                      
                        | 
                            2001(drawing
                                  in progress)
 |  |  |  
                
                  | Client: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | Stan LeopardDesign, Project Manage
 Matt Taylor
 n/a
 Sebastopol, California
 Work Ongoing
 W.
 |  
                
                  | office_hotelling_prototype |  
                
                  | Work 1652007 
                        - Office Hotelling Prototype
 |  
                
                  | 
                    
                      
                        | 
                            2001(confidential until completed)
 |  | 
                      
                        
                          | Publication when client approves  [future link] |  |  
                
                  | Client: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | confidential until completedconfidential until completed
 Matt Taylor
 n/a
 confidential until completed
 confidential until completed
 W.
 |  
                
                  | Work 1662007 
                        - Studio Treehouse @ Elsewhere
 |  
                
                  | 
                    
                      
                        | 
                            2001(drawing
                                  in progress)
 |  |  |  
                
                  | Client: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | Matt and Gail Taylor Study
 Matt Taylor
 n/a
 Elsewhere
 In design
 A small elevator Studio that. rises on cables to 75 feet high in a redwood tree cluster and overlooks the ocean a mile away.
 |  
                
                  | Work 1672007 
                        - Masters Academy Snowflake Demonstration
 |  
                
                  |  | 
                      
                        
                          | SnowFlake original configuration  [future link] |  |  
                
                  | Client: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | MD
 C
 M
 C
 P
 W.
 |  
                
                  | Work 1682007 
                        - Masters Classroom Prototype
 |  
                
                  | 
                    
                      
                        | 
                            2001(drawing
                                  in progress)
 |  |  |  
                
                  | Client: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | MD
 C
 M
 C
 P
 W.
 |  
                
                  | Work 1692007 
                        - Extremadura NavCenter
 |  
                
                  |  | 
                      
                        
                          | Picture of abandoned cement factory to be recreated as a Center to facilitate the making of a region-wide “replacement economy”  [future link][link: trip to spain]
 |  |  
                
                  | Client: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | confidential until completedconfidential until completed
 Matt Taylor
 n/a
 confidential until completed
 confidential until completed
 W.
 |  
                
                  | Work 1702007 
                        - Minneapolis VA NavCenter
 |  
                
                  | Client: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | cc
 Bill Blackburn
 n/a
 c
 c
 W.
 |  
                
                  | Work 1712007 
                        - Space Colonies Redux
 |  
                
                  | Client: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | cc
 Matt Taylor
 n/a
 c
 c
 W.
 |  
                
                  | Client: Work:
 Design:
 DBU Team:
 Location:
 Status:
 Notes:
 | cc
 Matt Taylor
 n/a
 c
 c
 W.
 |  
                
                  | Work 1732007 
                        - CyberCon Media POD
 |  
                
                  |  | 
                      
                        
                          | Schenatic Model of POD  click on drawingto go to web page
 
 |  |  
                
                  | Client: Work:
 Design:
 DBU Team:
 
 Location:
 Status:
 Notes:
 | AI Product and Several Client Environments Design, Build, Use  - Manufacture
 Matt Taylor
 Mat Taylor, Rodney Meadows, Mike Byrne and AI Shop Crew
 Client environments in Nashville and Virginia
 In Development and Installed in Virginia
 Any application of the CybeCon concept and its integration with work processes and work environment creating a technology POD with multiple applications.
 |  
                
                  | 
                      
                    
                        
                          | The sum of this work will be my topic at this ending explanation of our 2007 and 2008 work. I will leave this to later after the work it further developed and the year more behind us rather than ahead. |  |  
                
                  |  | 
                    
                      
                        | There is no followingURL, yet...
 Work #173 is the most recent logged in project
 |  |  
                  | GoTo: Work # 158 |  |  
                
                  | Matt 
                    Taylor Elsewhere
 June 11, 2007
 
                        
                          | 
                              
                                
                                  |   
 SolutionBox 
                                      voice of this document:VISION  STRATEGY  EVALUATION
   |  |  
 |  
                
                  | 
                        posted: 
                      June 11, 2007 revised: June 12, 2007
 
 • 20070611.436291.mt • 20070612.471109.mt •
 (note:
                      this document is about 20% finished) Matt
                      Taylor 615 525 7053  me@matttaylor.com Copyright© Matt
                      Taylor 2007  |  |  
 |